| Tailings Management Areas |
| Wismut GmbH has responsibility for the rehabilitation of
four tailings management areas: the Helmsdorf and Dänkritz 1 facilities
near the town of Zwickau as well as the Culmitzsch and Trünzig facilities
at the Seelingstädt site. Together they cover an area of more than
570 hectares and contain fine-grained tailings from the processing of
uranium ores. Rehabilitation of the tailings management areas is one of
the largest challenges of the Wismut project.
During the first years after the mills shut down, emphasis at all sites
was placed on immediate remediation efforts to protect workers and the
general public against harmful effects. To this end, exposed beach areas
were covered with mineral soil to reduce wind-blown dispersal of radioactive
dust. Seepage collection systems were extended and new systems were
constructed to protect surface waters and aquifers. While immediate
hazards were mitigated, studies investigated various remedial options
for achieving long-term stabilisation of the tailings ponds. As a result,
dry in-situ stabilisation was selected as the most cost-efficient option.
It involves rehabilitation in place, removal of supernatant water, stabilisation
of fine-grained residues using geotechnical means, and construction
of a final cover of different layers of mineral materials. This general
engineering approach is being applied at all four sites.
|