| Waste Rock Pile Remediation |
with the highest acid generating potential will be placed
into the bottom – Zone A, below the final ground water level.
Low acid-generating materials will be placed in the overlying oxygen
depleted Zone B, while Zone C will be filled with acid-consuming waste
rock materials. In the Ronneburg district north of the A 4 motorway, the Drosen and
Korbußen waste rock piles were excavated and hauled to the Beerwalde
complex where they were banked against the Beerwalde mine dump. This
move was designed to concentrate the contaminant inventory in a single
place. A cover of 1.9 metre thickness was placed on top of the Beerwalde mine dump. Holding 9 million cubic metres of waste rock, the newly constructed
landscape feature was capped with a 2 m thick cover which supports initial
vegetation growth.
|