| The remedial concept for the Crossen site proposes
to haul waste rock material, demolition debris, and excavated soil material
to the nearby Helmsdorf TMA were the materials will be used as fill
during cover construction.The pipe conveyor was commissioned in 1997
to ensure environmentally friendly haulage of the Crossen materials
to the tailings pond site.
With a total length of some 2 km, the pipe conveyor bridges the Zwickauer
Mulde river, federal road # 93/175 and railway lines.
Characteristics:
|